· FREE TOOL · ONE UPDATE · XER + NARRATIVE
Does the narrative
match the schedule?
Drop one XER and the narrative that came with it. See which activities that matter go unmentioned, which statements the file doesn’t support, and which required items are missing.
01 · SCHEDULE.xer, .mpp, .xml, .pmxml · up to 50 MB
.XER
Drop the update’s schedule
XER is read directly; MS Project/XML/PMXML go through a conversion step. One project per run.
02 · NARRATIVE
PDFDOCXDOCRTFTXTMD
Drop the narrative and attachments
Up to 5 files, 200 pages. Pictures inside files are skipped.
Nothing is uploaded — this runs entirely in your browser. Results, exports and the comment draft are free, with no account or email.
· WHAT IT REPORTS
Counts, not a grade.
NOT MENTIONEDDriving, near-driving, late, constrained and out-of-sequence activities the narrative never addresses.
NOT SUPPORTEDDates, percents, float and “on schedule” claims tested against the file, with the page quoted.
NOT INCLUDEDThe spec’s required narrative items, each marked present, weak or absent.