· FREE TOOL · 18 CHECKS · NO SIGN-UP
What in this schedule needs attention, and why?
Drop a P6 .xer and run 18 schedule-quality checks with thresholds you set. Every finding shows the value, the limit and the XER row it came from.
Runs on this devicePDF + Excel reportsNo score, no badges
.XER
Drop the schedule to review
Native Primavera P6 XER export · nothing is uploaded
NO FILE HANDY?
The 18 checks
Default thresholds are review heuristics you can change — not USACE, NAVFAC or DCMA contract limits.Q01Missing predecessorsWARNING
Q02Missing successorsWARNING
Q03Circular logicERROR
Q04Broken referencesERROR
Q05Negative lagWARNING
Q06Long positive lagWARNING
Q07Unusual relationship typesWARNING
Q08Long activity durationWARNING
Q09Negative floatWARNING
Q10High floatWARNING
Q11Restrictive constraintsWARNING
Q12Missing/inconsistent datesERROR
Q13Progress inconsistenciesWARNING
Q14Out-of-sequence progressWARNING
Q15Calendar issuesERROR
Q16Milestone inconsistenciesWARNING
Q17Duplicate activity codesERROR
Q18Resource/cost loading gapsWARNING
· HOW RESULTS READ
Not checked is never a pass.
If the file can't support a check — a missing calendar, an unknown lag basis — the rule says so by name, with how many activities it skipped.
FINDINGSAt least one item crossed your threshold.
PASSEvaluated, and nothing crossed the threshold.
NOT EVALUATEDThe file lacks what the check needs. Never counted as a pass.
NOT APPLICABLESwitched off by an explicit setting, such as resource loading.